As mentioned in an earlier blog entry, the Beltway HOT lanes project public hearings will be held on May 20 & 21. One month before the hearings the current plans for the project must be available to the public for review. We recently rode to the VDOT headquarters, a not very bike-friendly location, to look at the plans. FABB's position has been that VDOT and the HOT lanes contractors Fluor and Transurban should follow the guidelines in the Fairfax County Comprehensive Trails Plan for all reconstructed bridges over the HOT lanes.

We've posted copies of some of the plans online. From our initial review, it appears that most of the Trails Plan facilities are included in the project plans. A summary table of the VDOT and Fairfax Co DOT agreement on bike/ped facilities lists the Trails Plan requirements, the HOT lane team proposals, and the County recommendations, most of which match the Trails Plan. The key text in the document is the last entry, footnote 4: “VDOT concurs with the FCDOT Staff Recommendation.”

There are still some outstanding issues:
  • Leesburg Pike - Route 7—While we are quite sure that multiuse trails will be included on both sides of the bridge, we do not have a copy of those plans.
  • Gallows Road—The planned bike lanes on Gallows Rd do not appear to be included in the plans. Gallows Rd is a major bike commuter route. It is one of the few roads in the county for which funds are available for building bike lanes. It's critical that bike lanes be included on this road.
  • Wakefield bike/ped bridges—This bridge near Wakefield Park is currently 8 feet wide. The new bridge will not be any wider. It should be the same width as the W&OD Trail bridge, 16 feet. At a minimum it needs to be 10 feet, VDOTs standard for a multiuse trail.
Overall we are very encouraged by the inclusion of bike facilities in the plans. All cyclists who are interested in being able to safely cross the Beltway by bicycle should either attend the public hearings and speak out in support of the proposed plans, or send comments by June 5 to Meeting_Comments@VDOT.Virginia.gov.

See the FABB HOT Lanes Summary Page for more in formation.

Comments:
According to AASHTO's _Guide to the Development of Bicycle Facilities_ which is the basis for VDOT's bikeway design standards, shared-use paths on structures (e.g., bridges and tunnels) should be at least four feet wider than the approaching (10-foot minimum width) paths. This extra width provides a two-foot clear zone in each direction which should buffer the path at all times.

Thus, the bicycle bridges crossing the Beltway should be at least 14 feet wide.
 
Post a Comment
Contact FABB via email: info@fabb-bikes.org

Subscribe to the
FABB e-newsletter


Subscribe to
Posts [Atom]


  Bike to Work Day 2004 at Reston Town Center

  Transportation choices

This page is powered by Blogger. Isn't yours?

Archives

February 2007
March 2007
April 2007
May 2007
June 2007
July 2007
August 2007
September 2007
October 2007
November 2007
December 2007
January 2008
February 2008
March 2008
April 2008
May 2008
June 2008
July 2008
August 2008
September 2008
October 2008
November 2008
December 2008
January 2009
February 2009
March 2009
April 2009
May 2009
June 2009
July 2009
August 2009
September 2009
October 2009
November 2009
December 2009
January 2010
February 2010
March 2010
April 2010